Project Description
POS-EO-24SC: designed to install optical – copper cable.
POS-EO-24SC is ourdoor version.
Copper distribution Cabinet KP version: 200/300/600/1200/1600 PCS.
High dust – rain – flood resistance, apply with high humidity and hot enviroment.
The cabinet is fully designed with convenient features for the construction of welding cables. There are holding structures and cable running directions so that the R angles of the cable are ³ 30mm.
Material: steel CT 1,4mm with electro Static Power Coating ( light gray ).
Convenient access for installation, maintenance
Cabinet cabinet design opens 180 ° in front of the face, with lock and handle for convenient opening, the cabinet is designed to add a sub lock structure.
Materials for cabinet and cabinet construction: Composite / ABS reinforced SCM / BMC grade glass fiber.
Cabinet body: There is a structure of reinforcing ribbed structure
High temperature resistance (degree C): Ensuring high temperature resistance of 100 degrees C, 5 hours does not cause deformation, blistering.
Mechanical strength: Meets IEC 61300-2-12 Method B standard
CONNECT WITH US